{"format":"zambo.workflow-recipe","version":"1.0.0","updated_at":"2026-11-11","title":"Draft a risk register: music release plan","slug":"music-release-plan-draft-risk-register","purpose":"List stated or clearly labeled potential risks and review actions.","audience":"Creators","status":"illustrative_not_executed","validated_against":{"catalog":"https://zambo.dev/mcp?full=true","validation":"Schema checks are performed by the release validation command; not an execution claim."},"client_compatibility":{"protocol":"MCP Streamable HTTP","endpoint":"https://zambo.dev/mcp","tested_clients":[],"note":"Not executed in every AI client. Use a supported client listed at /add/."},"mapping_legend":{"$from_user":"Use the declared owner-approved input; ask instead of guessing.","$from_current_job":"Use one stable current job/session value."},"user_inputs":["context_1","context_2","context_3","source_text","prepared_request"],"input_contract":[{"name":"context_1","label":"approved assets","type":"string","example":"Supply the actual approved assets; leave it unknown if not provided."},{"name":"context_2","label":"confirmed distribution dates","type":"string","example":"Supply the actual confirmed distribution dates; leave it unknown if not provided."},{"name":"context_3","label":"rights-clearance status","type":"string","example":"Supply the actual rights-clearance status; leave it unknown if not provided."},{"name":"source_text","label":"Public or redacted source material","type":"string","example":"The artist supplied a draft timeline with one sample-clearance question outstanding."},{"name":"prepared_request","label":"Owner-reviewed drafting brief assembled from the supplied material","type":"string","example":"List stated or clearly labeled potential risks and review actions. Context: The artist supplied a draft timeline with one sample-clearance question outstanding. Requested sections: risk, evidence or assumption, possible impact, review action. Label unknowns; do not invent facts."}],"input_assembly":"The host AI assembles prepared_request from the approved source, context fields, task goal and required output sections, then gets owner approval before the tool call.","steps":[{"id":"draft","tool":"write","action":"Prepare the requested draft a risk register from the approved brief.","arguments_template":{"topic":"Draft a risk register: music release plan","details":{"$from_user":"prepared_request"},"audience":"Creators","tone":"clear and factual","_session_id":{"$from_current_job":"session_id"}},"expected_output":"A draft to review, never a published, sent, independently verified or client-approved result.","authorization":{"user_approval":"Use only approved public or redacted input. Ask before saving a handover, sharing, paying, or taking an external action.","secrets":"Never include credentials or private access codes in a recipe or public record."},"stop_and_resume":"Stop if a required source or approval is missing; ask instead of guessing. Stop on a tool error or unexpected output; keep the actual receipt and resume only from the last confirmed step. Do not buy, send, publish, change access, or contact anyone without a separate authorized action."},{"id":"review","type":"human_action","action":"List stated or clearly labeled potential risks and review actions. Use the observed tool output, not an assumed result.","arguments_template":{},"expected_output":"Owner-reviewed output with these sections: risk; evidence or assumption; possible impact; review action. Apply: Do not imply rights clearance or guaranteed placement; Do not upload or distribute assets. Do not invent probabilities severity measurements or guarantees.","authorization":{"user_approval":"Use only approved public or redacted input. Ask before saving a handover, sharing, paying, or taking an external action.","secrets":"Never include credentials or private access codes in a recipe or public record."},"stop_and_resume":"Stop if a required source or approval is missing; ask instead of guessing. Stop on a tool error or unexpected output; keep the actual receipt and resume only from the last confirmed step. Do not buy, send, publish, change access, or contact anyone without a separate authorized action."},{"id":"close","tool":"workflow_close","action":"Close the same job session and return the actual workflow/receipt links.","arguments_template":{"_session_id":{"$from_current_job":"session_id"}},"expected_output":"A recorded workflow page for actual Zambo calls, not proof that the output is correct or approved.","authorization":{"user_approval":"Use only approved public or redacted input. Ask before saving a handover, sharing, paying, or taking an external action.","secrets":"Never include credentials or private access codes in a recipe or public record."},"stop_and_resume":"Stop if a required source or approval is missing; ask instead of guessing. Stop on a tool error or unexpected output; keep the actual receipt and resume only from the last confirmed step. Do not buy, send, publish, change access, or contact anyone without a separate authorized action."}],"safety":{"no_payment_or_external_action":true,"privacy":"Only owner-approved public or redacted material. Remove personal data, credentials, private URLs and client secrets before a tool call; public receipts may expose call details.","receipt_scope":"Records Zambo-observed calls, not accuracy, legal authority, client approval or an outside outcome."},"pricing":["20 shared metered calls/day plus one free wrap-up.","Day Pass $0.99/24h; Zambo Pass $29/30 days: identical access, different duration.","Lifetime $250 once, human checkout only. No subscription. Outside provider plans and costs are separate."]}
